What are bulk cargo buildings?

ERG bulk cargo buildings are an economical & ideal solution for all storage companies  ores, fertilizers, earthworks & ceramics. They can ensure the fulfillment of the needs of the above companies as they are adapted and designed according to their own requirements and specifications.

Applications

In bulk cargo buildings it is possible to apply sliding curtains but also the application of single or double roller door equipped with vertical waterproof pipes & floor posts. Where frequent entry or exit is expected, it is advisable to equip the construction with fast automatic doors. Also available with adjustable automatic - fast motion version. It is possible to install one or more safety exits for pedestrians in order to ensure a suitable escape route.  They can also  to add protective metal bars and special systems depending on the business sector. (for example:  Shelving System )

 Technical specifications & Construction 

ERG industrial buildings can be Mobile or Fixed. The cover is made  from durable polyester fabric, coated with PVC with refractory processing class II, total weight of 800gr / m2 per square meter. Upon request, the cover can be made of Panama double- layer PVC fabric with fire safety class II of a total package weight of 1050 gr / m2 . The floor guides are made of steel with a suitable cross-section, which can be canceled with external plugs as well as anchored with a suitable cement base. They can be boxed on the concrete floor, and a special wall bracket can also be created.
 

Delivery time

Security & Warranty

Licensing

Quality

Price

Delivery time after check, does not exceed  21-45  working days for most  buildings and during their installation do not interfere  the operation of a business.

The construction materials of ERG buildings ensure stability, guarantee and security. All our products are ISO certified.  Also the ERG  also provides After Sales Service.

The construction of its mobile buildings  ERG  can be done without always needing a building permit,  depending on the area  of the construction.

Costing & Offering Issue

Upon contact, a qualified engineer will visit your site for investigation  needs and taking appropriate measurements (if necessary). Then you will be issued an offer based on the design and study of the construction. Finally, once the offer is accepted, the procedures for the implementation of the project begin. 

At a glance ...

Immediate & economical turnkey solution

Height from 3m - 7.5m and with special order reaches 9.00m

Installation inside: shelves, lifts

Disassembly and transfer to another location

21sqm - 45sqm from 5 to 15 working days

100sqm - 1,000sqm from 20 to 45 working days

Complete electrical installations

mobile gif.gif

Four basic stages

Visit of a specialized engineer

Offer version according to your needs!

Offer acceptance

Implementation of the project!