top of page

ERG

Bellows

Loading and unloading 

Services & Products > Mobile Buildings > Special Buildings  Loading and unloading bellows

What are Loading and Unloading Bellows

ERG loading and unloading bellows are an economical & immediate solution for supply chain management companies (Logistics companies), for companies where they own distribution / sorting warehouses & in companies where they want to organize the inflow, internal distribution and outflow of materials and products but also for companies where they want to create loading-unloading areas.  Loading and unloading bellows are customized and designed according to their own requirements & standards. At the same time, they are suitable for the construction of processing facilities  &  repackaging  products by expanding existing facilities, thus ensuring faster and more flexible work.

Applications

On loading and unloading bellows  it is possible to apply sliding curtains. Protective metal bars and special systems depending on the business sector can also be added. (for example: Shelving System )

 Technical specifications & Construction 

The cover is made  made of durable polyester fabric, coated with PVC with refractory treatment  class II, total weight of 800gr / m2 per square meter. Upon request, the cover can be made of Panama double- layer PVC fabric with fire safety class II of a total package weight of 1050 gr / m2 . The floor guides are made of steel with a suitable cross-section, which can be canceled with external plugs as well as anchored with a suitable cement base. They can be boxed on the concrete floor, and a special wall bracket can also be created.
 

Delivery time

Delivery time after inspection, does not exceed 21-45 working days and during their installation do not interfere  the operation of a business.

Security & Warranty

The construction materials of ERG buildings ensure stability, guarantee and security. All our products are ISO certified.  Also the ERG  also provides After Sales Service.

Licensing

The construction of ERG mobile buildings can be carried out without always needing a building permit

Costing & Offering Issue

Quality

Price

Upon contact, a qualified engineer will visit  your space for exploration  needs and taking appropriate measurements (if necessary). Then you will be issued an offer based on the design and study of the construction. Finally, once the offer is accepted, the procedures for the implementation of the project begin. 

At a glance ...

Immediate & economical turnkey solution

Height from 3m - 7.5m and with special order reaches 9.00m

Change of commercial goal

Disassembly and transfer to another location

21sqm - 45sqm from 5 to 15 working days

100sqm - 1,000sqm from 20 to 45 working days

Complete electrical installations

Installation of internal shelves and lifting machines

Four basic stages

Visit of a specialized engineer

Offer version according to your needs!

Offer acceptance

Implementation of the project!

Man Welding

ERG

After Sales Service

learn more
bottom of page